Waste Analysis and 5S-Based Improvement Proposals in UPVC Bathroom Door Production
Abstract
The production process of UPVC bathroom doors at Sinar UPVC still faces various wastes that cause low work efficiency. Problems found include unsystematic arrangement of tools and materials, waiting time during the production process, and operator movements that do not provide added value. These conditions have an impact on increasing production time and reducing company productivity. This study aims to identify waste that occurs in the production process, determine the dominant types of waste, and analyze the root causes of waste as a basis for preparing improvement proposals. The research method used is the Lean Manufacturing approach with the application of 5S (Seiri, Seiton, Seiso, Seiketsu, and Shitsuke). Data collection was carried out through direct observation, interviews, documentation, and measurement of process time. Data analysis included waste identification, data adequacy and uniformity tests, Flow Process Charts (FPC), and Fishbone Diagrams to determine the root causes of waste. The results showed that the dominant wastes were motion and waiting. After the implementation of the 5S-based improvement proposals, motion waste decreased by 50.00%, while waiting waste decreased by 53.85%. These improvements also increased production process efficiency by 16.67%. Thus, implementing the 5S method has been proven to reduce waste, improve work area conditions, and increase production efficiency at Sinar UPVC.
References
A. D. Fawwazdiq and S. Sutrisno, “Analisis Pemborosan Pada Area Penyimpanan Di Gudang Sparepart Dengan Metode Waste Assesment Model.” doi: https://doi.org/10.37090/indstrk.v8i3.1464ResearchGate+1.
D. Derlini and T. Siagian, “Penerapan Lean Manufacturing Untuk Mengurangi Waste Dalam Proses Produksi Di Industri Manufaktur,” J. Rev. Pendidik. dan Pengajaran, vol. 8, no. 1, pp. 784–790, Jan. 2025, doi: https:// 10.31004/jrpp.v8i1.41606.
Muhammad Kyodan Khalidzky, Winarno, and Wildan Fatchan Maulidin, “Lean Manufacturing dalam Reduksi Waste untuk Peningkatan Efisiensi Produksi Konektor Tipe X di PT XYZ,” J. Engine Energi, Manufaktur, dan Mater., vol. 9, no. 1, pp. 026–036, Apr. 2025, doi: https:// 10.30588/jeemm.v9i1.2136.
H. Zulfi Amanda, G. Fabian Valentino, and H. Irwan, “Penerapan 5s Sebagai Upaya Meningkatkan Efisiensi Tempat Kerja Dan Usaha Kecil Menegah,” J. Manaj. Rekayasa dan Inov. Bisnis, vol. 4, no. 1, pp. 72–82, 2025, doi: https:// 10.62375/jmrib.v4i1.663.
A. Johan and D. Soediantono, “Literature Review of the Benefits of Lean Manufacturing on Industrial Performance and Proposed Applications in the Defense Industries,” 2022. doi: https://10.7777/jiemar.v3i2.272.
N. Penulis, : Zainal, and F. Rosyada, “Penerapan Lean Manufacturing untuk Meminimasi Pemborosan di IKM Logam Tegal Menggunakan 5S Corresponding Author,” vol. 2, no. 4, 2025, doi: https://doi.org/10.62375/jmrib.v4i1.663.
Dianta Mustofa Kamal and Yasmin Alifya Azfari, “Identifikasi Pemborosan Menggunakan Metode Waste Assessment Model (WAM) pada Proses Produksi NC212 di Bagian Fuselage Assy dan Door Assy di PT Dirgantara Indonesia,” J. Stud. dan Apl. Tek. Sipil, vol. 1, no. 2, pp. 60–64, Aug. 2025, doi: https://10.64123/jsats.v1.i2.4.
V. Mayang, L. P. S. Hartanti, and J. Mulyono, “Identifikasi Waste pada Proses Produksi Paku Menggunakan Metode Waste Assessment Model,” Bul. Profesi Ins., vol. 5, no. 1, pp. 1–8, 2022, doi: https:// 10.20527/bpi.v5i1.122.
M. A. Setiadi, C. E. Novita, A. Revaldy, A. R. Nugroho, and H. H. Purba, “Penerapan Seiri, Seiton, Seiso, Seiketsu, Shitsuke (5S) pada Industri: Kajian Literatur,” J. Media Tek. dan Sist. Ind., vol. 9, no. 2, pp. 165–176, Oct. 2025, doi: https://10.35194/jmtsi.v9i2.4925.
I. A. Rawabdeh, “A model for the assessment of waste in job shop environments,” Int. J. Oper. Prod. Manag., vol. 25, no. 8, pp. 800–822, Aug. 2005, doi: https:// 10.1108/01443570510608619.
J. S. Randhawa and I. S. Ahuja, “5S – a quality improvement tool for sustainable performance: literature review and directions,” 2017, Emerald Group Publishing Ltd. doi: https:// 10.1108/IJQRM-03-2015-0045.
I. F. Burhanuddin and N. Hamidah, “Implementasi 5S Sebagai Upaya Peningkatan Efisiensi pada Produksi Cetakan Roster di UD ABXYZ,” J. Tek. Ind. Terintegrasi, vol. 8, no. 4, pp. 4232–4243, Oct. 2025, doi: https:// 10.31004/jutin.v8i4.50708.
H. R. Zadry, R. Darwin, and H. R. Zadry, “The Success of 5S and PDCA Implementation in Increasing the Productivity of an SME in West Sumatra,” in IOP Conference Series: Materials Science and Engineering, IOP Publishing Ltd, 2020. doi: https:// 10.1088/1757-899X/1003/1/012075.
S. Kanamori, A. Shibanuma, and M. Jimba, “Applicability of the 5S management method for quality improvement in healthcare facilities: A review,” 2016, BioMed Central Ltd. doi: https://10.1186/s41182-016-0022-9.
M. Fadil, D. Tauhida, and S. B. Sutono, “Implementasi Lean Manufacturing Untuk Mengidentifikasi Waste pada UKM Faulia Bordir,” Simetris J. Tek. Mesin, Elektro dan Ilmu Komput., vol. 15, no. 1, pp. 271–278, 2024, doi: https://10.24176/simet.v15i1.10885.
R. Z. Firdaus and W. Wahyudin, “Penerapan Konsep Lean Manufacturing untuk Meminimasi Waste pada PT Anugerah Damai Mandiri (ADM),” J. Integr. Syst., vol. 6, no. 1, pp. 21–31, 2023, doi: https:// 10.28932/jis.v6i1.5632.
F. Sumasto et al., “Penerapan Prinsip 5S untuk Mengurangi Waste Motion dalam Proses Layanan Galon R-Water,” J. Serambi Eng., vol. 9, no. 1, pp. 7788–7794, Oct. 2023, doi: https://10.32672/jse.v9i1.742.
N. F. Sya’ban, R. L. Q. Kinanti, Z. F. Rosyada, A. Bakhtiar, and C. A. P. Hapsari, “Penerapan Lean Manufacturing untuk Meminimasi Pemborosan di IKM Logam Tegal Menggunakan 5S,” J. Pengabdi. Sos., vol. 2, no. 4, pp. 3437–3445, Feb. 2025, doi: https:// 10.59837/09dc5w70.
W. T. W. Siagian and J. A. S. TEKMAPRO, “Analisis Penerapan Lean Manufacturing Dengan Metode Vsm (Value Stream Mapping) Guna Mengurangi Waste Dan Cycle Time Pada Proses Produksi Keramik Di Pt Xyz,” Tekmapro, vol. 19, no. 2, pp. 242–253, 2024, doi: https:// 10.33005/tekmapro.v19i2.419.
B. Oleksiak, M. Żyszczyński, and K. Micor, “5S Method Usage for the Improvement of Production Process in the Manufacturing Company,” Manag. Syst. Prod. Eng., vol. 33, no. 3, pp. 354–361, Sep. 2025, doi: https:// 10.2478/mspe-2025-0033.
B. Kanabar, K. G. Piparva, D. Pandya, and R. B. Kanabar, “The Impact and Challenges of the Implementation of 5S Methodology in Healthcare Settings: A Systematic Review,” Cureus, Oct. 2024, doi: https:// 10.7759/cureus.64634.
















