Penerapan Metode Seven Tools Untuk Pengendalian Kualitas Biji Kopi Arabika (Studi Kasus Grand Melati Coffee & Roastery Di Kota Langsa)

  • Muhammad Husein Muhammad Husein Universitas Samudra
  • Meri Andriani Universitas Samudra
  • Dewiyana Dewiyana Universitas Samudra
Keywords: Coffe Shop, Biji Kopi Arabika, Pengendalian Kualitas, Seven Tools, Produk

Abstract

Grand Melati Coffee & Roastery is one of the coffee shop SMEs in Langsa City that operates in the field of beverages and coffee bean processing. The products produced are coffee drinks and arabica coffee beans that have been marketed both within and outside Langsa City. The quality control implemented at Grand Melati Coffee & Roastery is not very good, as evidenced by the frequent discovery of defective products and the inability to identify the causes of defects in detail. Efforts that can be made to ensure the quality of a product include taking preventive measures against potential failures in the coffee bean production process. The aim of this research is to identify the factors that cause defects in coffee bean products and to analyze the quality control of the coffee bean production process at Grand Melati Coffee & Roastery. The method used in this study is the seven tools method. Based on the research results, The total coffee bean production at Grand Melati Coffee & Roastery during June 2023 was 112 Kg with the amount of defective coffee products being 19.125 Kg. The dominant causes of these defects are human factors, materials, methods, and machines.

References

1. hatillah R. Journal Of Industrial Perencanaan dan Penjadwalan Aktivitas Distribusi Crumb Rubber dengan Metode Distribution Requirement Planning. J Ind Syst Eng [Internet]. 2021;2(1):52–61.
2. Herdiani L, Kustiawan R. Penjadwalan Distribusi Produk Larutan Kaki Tiga Menggunakan Distribution Requirement Planning (DRP) Di PT. Duta Lestari Sentratama Bandung. J Transp Multimoda. 2015;41–52.
3. Kulsum K, Muharni Y, Mulyawan MR. Penjadwalan Distribusi Produk Dengan Metode Distribution Requirement Planning (Studi kasus produk air minum dalam kemasan). Tek J Sains dan Teknol. 2020;16(1):45.
4. Hidayat R, Munir M. Menggunakan Metode Distribution Requirement Planning (DRP) Di Home Industri Three Star’S. 2018 . 2012;40–8.
5. Hanafie A, Syarifuddin R, D A. Penjadwalan Distribusi Dengan Menggunakan Metode Distribution Resources Planning (DRP) (Studi kasus PT.Biota Laut Ganggang). J Ind Eng Manag. 2020;1(02):31–6.
6. Sanusi R, Bina U, Informatika S. Penerapan Metode Distribution Requirement Planning ( DRP ) Untuk Distribusi Produksi Barang. 2022;11(1):6–12.
7. Balqis I. Implementasi Distribution Requirement Planning (DRP) Dan Saving Matriks Untuk Meminimalisir. 2022;3(1):8–13.
8. Kusuma Ningrat N, Aristriyana E. Penerapan Metode Distribution Requirement Planning (Drp) Dalam Penjadwalan Distribusi Produk Di Ukm Sb Jaya Ciamis. J Ind Galuh. 2023;5(2):92–105.
9. Kosasih W, Kumala IS, Salim Y. Evaluasi Sistem Distribusi Industri Kecil Menengah Menggunakan Metode Forecasting Dan Distribution Requirement Planning (Studi Kasus: Cv. Mandala Citra Lestari, Tangerang). J Ilm Tek Ind. 2018;5(3):139–47.
10. Raharja A, Angraeni W, Vinarti RA. Penerapan Metode Exponential Smoothing Untuk Peramalan Penggunaan Waktu Telepon Di PT.Telkomsel Divre3 Surabaya. J Sist Inf. 2007;1–9.
11. Rachman R. Penerapan Metode Moving Average Dan Exponential Smoothing Pada Peramalan Produksi Industri Garment. J Inform. 2018;5(2):211–20.
12. Dinata A, Zahri A, Renilaili. Perencaan Dan Penjadwalan Aktivitas Distribusi Batubara Dengan Distribution Requirement Planning (Studi Kasus: PT. Lematang Coal Lestari). Bina Darma Conf Eng Sci. :355–66.
13. Bina PT, Bersama U, Lhokseumawe S. Penjadwalan Distribusi Dengan Metode Distribution Requirement Planning (DRP) Di Pt. Bina Usaha Bersama Sehati Lhokseumawe. 2020;03(02):1–5.
14. Intan Abadi Rivaldi B, Marikena N. Perencanaan Distribusi Kayu Dengan Metode Distribution Requirement Planning (PT Bukit Intan Abadi). J Tek Dan Ind [Internet]. 2024;2(2):1. Available from: https://www.doi.org/10.22303/upu.1.1.2021.01-10
15. Kusuma YB. Control of Goods Distribution Using Distribution Requirement Planning Pengendalian Distribusi Barang Dengan Menggunakan Distribution Requirement Planning. Manag Stud Entrep J. 2023;4(3):2394–406.
16. Febrianto E, Hunusalela ZF, Prasasty AT. Penerapan Metode Distribution Requirement Planning Untuk Meminimasi Biaya Distribusi PT Sekeluarga. J Rekayasa Sist Ind. 2020;6(1):13–9.
17. Cv P, Mas K, Ciamis DI. Penjadwalan Distribusi Produk Dengan Metode Distribution Requirement Planing (DRP ). 2021;3(2):0–5.
18. Ulhaq Farid Z, Aristriyana E. Penjadwalan Distribusi Produk Dengan Metode Distribution Requirement Planing (DRP) Pada Cv. Kijang Mas 69 Di Ciamis. J Ind Galuh. 2023;3(02):93–8.
19. Rahman Lubis R. Perencanaan Dan Penjadwalan Aktivitas Distribusi Dengan Metode Distribution Requeriment Planning (DRP) Di Perusahaan Distributor Di PT Arta Boga Cemerlang Planning And Scheduling Of Distribution Activities Using The Distribution Requeriment Method Planning. IESM J [Internet]. 2023;4(2):148–60. Available from: https://www.doi.org/10.22303/upu.1.1.2021.01-10
Published
2025-10-01