A ANALISIS PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN PENGASPALAN JALAN KEUDE BIREM - ALUR TEH KECAMATAN BIREM BAYEUN ACEH TIMUR

  • RUSDI MAULANA UNIVERSITAS SAMUDRA
  • Marini Bravikawati UNIVERSITAS SAMUDRA
  • Defry Basrin UNIVERSITAS SAMUDRA
  • Eeka Mutia UNIVERSITAS SAMUDRA

Abstrak

Road paving works play a critical role in supporting economic growth and public welfare, as mandated by Government Regulation No. 34/2006. However, the implementation of such projects is often hindered by road damage and the limited availability of heavy equipment and skilled operators. This study aims to identify the types of heavy equipment used, calculate their production capacity, and analyze the duration of major construction phases. The method applied is time study, using primary data collected from field surveys and secondary data from supporting documents such as construction drawings and literature. The results indicate that each type of equipment showed varying levels of productivity deviation between planning and actual implementation. Dump trucks increased in productivity from 2.98 m³ to 3.49 m³, while motor graders decreased from 366.18 m³ to 317.475 m³. Significant increases were observed in the vibrator roller and air compressor, whereas asphalt finisher, tandem roller, and pneumatic tired roller experienced substantial drops in productivity. The asphalt sprayer maintained consistent performance at 4.980 liters/hour. In conclusion, heavy equipment productivity is significantly influenced by equipment type, field conditions, and operational coordination, all of which are crucial to ensuring timely project completion with quality standards met.

Referensi

Rorroong, D.S., 2022. Studi Kerusakan Prasarana Jalan di Pasar Sentral Kalibobo Kabupaten Nabire terhadap Aktivitas Ekonomi Masyarakat. Jurnal Teknik Sipil Cendekia, 3(2), pp.44–53.
Safitri, R., Zulkarnaen & Purnama, A., 2021. Analisis produktivitas alat berat untuk pekerjaan tanah pelaksanaan pembangunan bendungan Beringin Sila Kecamatan Utan. Jurnal SainTekA, 2(1), pp.8–14.
Febrianti, D. & Zakia, Z., 2018. Analisis produktivitas dan waktu penggunaan alat berat excavator pada pekerjaan galian tanah. Prosiding Seminar Nasional Pakar, pp.123–127.
Arsjad, T.T. & Mangare, J.B., 2020. Analisa perhitungan produktivitas alat berat pekerjaan pematangan lahan pembangunan tower SUTET Likupang - Paniki. Jurnal Sipil Statik, 8(1), pp.99–106.
Masherni, M. & Surandono, A., 2020. Analisis perencanaan pelaksanaan pekerjaan perkerasan kaku/rigid pavement ruas Padang Rartukalirejo STA 0+000 s/d 0+. Jurnal Program Studi Teknik Sipil [online], 9(2). Available at: https://www.ojs.ummetro.ac.id/index.php/tapak/article/view/1197.
Norjana, N. & Zulfiati, R., 2020. Analisa produktivitas tenaga kerja terhadap pekerjaan kolom dan balok beton bertulang. Jurnal Talent Sipil, 3(2), p.82.
Ma’arifah, F.R., 2021. Analisis produktivitas penggunaan alat berat pekerjaan timbunan pilihan pada pembangunan jalan. Kurva Mahasiswa, 11(1), pp.293–314.
Muis, Sideman, S. & Hasyim, 2017. Analisis produktivitas dan efisiensi alat berat pada proyek peningkatan jalan kabupaten Paket IV Ruas Pemepek – Repok Pidendang (Lombok Tengah). (Detail jurnal tidak lengkap).
William, W., Susila, H. & Mulyandari, E., 2022. Analisis produktivitas dan kebutuhan alat berat (studi kasus: proyek preservasi dan pelebaran jalan Palur-Sragen-Mantingan STA 0+325 – STA 2+325). Jurnal Teknik Sipil dan Arsitektur, 27(2), pp.44–51.
Kulo, E.N., 2017. Analisa produktivitas alat berat untuk pekerjaan pembangunan jalan (studi kasus: proyek pembangunan jalan lingkar SKPD Tahap 2 lokasi Kecamatan Tutuyan Kabupaten Bolaang Mongondow Timur). Jurnal Sipil Statik, 5(7), pp.465–474.Ahmed, 2005, Calibration of Vissim to The Traffic Condition Of Khobar and Damman, Saudi Arabia, King Fadh University of Potreleum and Mineral, Saudi Arabia.